With a team of over 250 people, including engineers, technicians, skilled workers and the system of modern production facilities, Fuji Vietnam to undertake the construction of industrial buildings, medium and large scale, the civil...

Read more
Consulting – Design, project management

Consulting – Design, project management

Establishment of investment projects, construction consulting, design, making total cost estimates and estimates of industrial buildings, civil and lifting equipment; Consulting construction supervision; Construction investment consultancy, technology transfer production of steel structures, mechanical engineering...

More Details
Supply and install steel structure

Supply and install steel structure

Pre-engineered steel building,combination steel beam, non standard steel structure, constructional equipment, crane for prefabricated housing frames of all spans. Producing non-standard structures, high/low tension poles, microwave poles. Producing non-standard structures, high/low tension poles, microwave poles...

More Details
Supply lifting equipment

Supply lifting equipment

Pre-engineered steel building,combination steel beam, non standard steel structure, constructional equipment, crane for prefabricated housing frames of all spans. Producing non-standard structures, high/low tension poles, microwave poles. Producing non-standard structures, high/low tension poles, microwave poles...

More Details

NIWA Hydraulic Components Factory

  • Client: [:en]NIWA Foundry Vietnam Co.,LTD [:vi]Công ty TNHH Niwa Foundry Việt Nam
  • Scale: 7.000 m2
  • Location: Da Nang high-tech Zone
  • Time: June in 2015

Muu Sinh Office Equipment Factory

  • Client: [:en]NIWA Foundry Vietnam Co., LTD [:vi]Công ty TNHH Mưu sinh GI
  • Scale: 6.000 m2
  • Location: Yen Phong Industrial Zone, Bac Ninh
  • Time: June in 2015

Ebara Phase 2 Pump Factory

  • Client: [:en]Ebara Vietnam Pump Co., LTD [:vi]Cty TNHH Bơm Ebara Việt Nam
  • Scale: 8.000 m2
  • Location: Lai Cach, Hai Duong
  • Time: April in 2015

SDIV Production Complex

  • Client: [:en]Samsung SDI Vietnam Co., LTD [:vi]Công ty TNHH Samsung SDI Việt Nam
  • Scale: 5.000 m2
  • Location: Yen Phong Industrial Zone, Bac Ninh
  • Time: October in 2013

Dai Thanh Long Phase 2 Logistic Factory

  • Client: [:en]Dai Thanh Long Transport and Trading Joint Stock Company [:vi]Công ty CP Vận tải & thương mại Đại Thành Long
  • Scale: 8.500 m2
  • Location: Phu Ly, Ha Nam
  • Time: June in 2014

Hung Huong Packaging Factory

  • Client: [:en]VIDACO Co., LTD [:vi]Công ty TNHH VIDACO
  • Scale: 12.000m2
  • Location: Vinh Tuong, Vinh Phuc
  • Time: August in 2012

Renting Factory Phase 2

  • Client: [:en]Sunfat Vietnam Co., LTD [:vi]Công ty TNHH Sunfat Việt Nam
  • Scale: 6.000 m2
  • Location: Bach Sam, My Hao, Hung Yen
  • Time: December in 2016

Precision Electrical Equipment Details Factory

  • Client: [:en]Santomat Vietnam Joint Stock Company [:vi]Công ty CP Santomat Việt Nam
  • Scale: 6.500 m2
  • Location: Vsip Industrial Zone, Bac Ninh
  • Time: November in 2016
Project Toyota Hiroshima Project-HCMC city

Project Toyota Hiroshima Project-HCMC city

The first step for big steel structure works. Surveyors and workers of Fuji Vietnam set up the foundation
Executing the Vienergy project

Executing the Vienergy project

Conducting construction works at Vienergy project – Phuc Son Industrial Park, Ninh Son, Ninh Binh, project scale 21Ha. ...
Project Progress Galaxy Cinema (Vinh – Nghe An)

Project Progress Galaxy Cinema (Vinh – Nghe An)

The project cinema Galaxy cinema in Vinh-Nghe An city. This is the fourth Galaxy Galaxy Theater complex construction
Check the schedule of the Vietpower project

Check the schedule of the Vietpower project

Company leaders check the progress of construction and motivate workers at Vietpower
Check the schedule of the Tai Yuen Textile project

Check the schedule of the Tai Yuen Textile project

The company leaders checked the progress of construction and motivate employees at the project of Dai Nguyen Textile Factory ...