DATE


03/2020

CLIENT


TODA Vietnam

PROJECT DESCRIPTION


  • Location: VSIP Binh Duong
  • Floor Area: 6000m2
  • Year: 2019-2020

 

default
default
default
default
default
default
created by dji camera

VIEW MORE

Related Projects

Sanaky Transformer manufacturing factory

Sanaky Transformer manufacturing factory

Location: Dong Van IZ -Ha Nam Floor Area: 80.000m2 Year: 2021

Ohsung Vina Factory Phase 2 Project

Ohsung Vina Factory Phase 2 Project

Location: Trang Due IZ – An Duong -Hai Phong – Vietnam Floor Area: 12.000 M2 (03 Storey with 1000tons of...

BYRON Vietnam Factory Phase 2

BYRON Vietnam Factory Phase 2

Location: Hoa mac IZ- Ha Nam Floor Area: 5000m2 Year: